showtime
Edition 216 Oct 2026Six practices
3 new, 8 updated since edition 1

From the harness behind showtime: github.com/FavioVazquez/showtime

Operating manual · an agent studio, edition 2, as of 16 Oct 2026

Many hands,
one yes.

showtime is an open-source video studio for coding agents: “Your agent directs. Your machine renders.” It is built by one person, Favio Vázquez, and a crew of agents. This is the crew’s operating manual: who does what, on which model and machine, and how a task becomes a merged PR or a film. Edition 1 was a snapshot as of 11 Oct 2026; edition 2 adds what changed through the 0.4.6 release on 16 Oct. Private names are left out and paths are generalized.

Route
01 / 10
49PRs merged into the private working repo from the first article (12 Oct) to the 0.4.6 release (16 Oct), each through Favio’s gate
4releases in those four days: 0.4.3 and 0.4.4 on 13 Oct, 0.4.5 on 15 Oct, 0.4.6 on 16 Oct
1+7a director session and seven lane sessions, each with its own state file, today
1person says yes to every merge, spend and public word
E2 · Six practices, new in edition 2

Six practices that catch what your agents miss

Edition 1 wrote down a rule: Favio must never be the one who notices. By 15 Oct he had noticed four times, and the crew had noticed two more misses itself. Each miss became one of the practices below. Each card gives the rule and how to set it up in your own setup; turn it over for the miss that taught it, what it cost and what it became: a check is enforced by code, a rule is written down.

The six practices in one short film. Every frame is drawn for it; none comes from a real film. Music: “Newer Wave” by Kevin MacLeod (incompetech.com), licensed under CC BY 4.0.
  1. A review counts only for the version it judged. Tie every verdict to the exact version it saw, and review again after any change. Set it up:
    1. Store every verdict with the id of what it judged: a commit hash, a render’s name, a file hash.
    2. Make the ship or merge step refuse a verdict whose id is not the current one.
    3. After any change, run the checks again, then a review that compares the new version with the judged one.
    The miss that taught it: A label over a label. Two labels sat on top of each other at 0:46 of a film. The critic’s last round had judged an earlier render; the fixes for its findings moved a label, and no round judged the render that went out. Noticed by Favio. What it cost: Six more renders across both aspects before a fixed copy went out, and a new critic round. What it became: showtime check looks for text over text across the whole timeline, in 0.4.6. And a critic’s verdict counts only for the render it judged.
  2. Read the failing log before any re-run. Name the cause of a failure, and whether it can happen again, before anyone presses re-run. Set it up:
    1. On a failed check, read the failing test’s log and its code first.
    2. Write down the cause and whether it can repeat.
    3. Re-run only for a cause that cannot repeat, and say so.
    4. A failure that will repeat and has nothing to do with the change goes to a person as a decision, with its cause.
    The miss that taught it: A re-run that waited for nothing. A CI job failed on a public pull request and was re-run before anyone read its log. The log had the cause: an icon lookup waited 38.5 s against a 30 s limit, so it would fail again. Noticed by Favio. What it cost: 15.6 minutes of CI on a failure the log already explained. What it became: A written rule for every session. The fix, which suggests from the local index before any fetch, merged the same day.
  3. Estimate in agent time, from your own measured runs. Base every estimate on runs you have measured, and name the slow part. Set it up:
    1. Log the start and end of every agent task.
    2. Make estimates quote those runs: a decided tool change with tests takes a minute or two.
    3. Name the slow part by its measured length, such as a render or a test suite, and don’t pad the total.
    The miss that taught it: An estimate in human time. A decided change to one of our tools, with 11 tests, came with an estimate of 20 to 30 minutes. It took 81 seconds. Noticed by Favio. What it cost: An estimate off by 15 to 22 times, and the waiting planned around it. What it became: A written rule: estimates come from our own measured runs, and the slow part gets named.
  4. Every output format is its own deliverable. Each format of the same work (an aspect ratio, a platform, a language) gets its own checks, its own review and a full look from start to end. Set it up:
    1. List every output format as its own item.
    2. Check text, and also drawn shapes and progress markers against the twin.
    3. Give each its own review, and scrub a contact sheet of the whole thing at one frame per second.
    The miss that taught it: A playhead that froze. In a film’s portrait cut the sound strip ran off its edge and the playhead froze from 14.4 s. The cause was a showtime bug: the strip ignored where the clip starts, in both aspects. Noticed by Favio. What it cost: A film already sent as final went back for a full re-render, and a finished work session reopened. What it became: A showtime fix and its test, in 0.4.6. And each aspect is its own film, with its own critic round, its own checks and a contact sheet scrubbed end to end.
  5. Give each session a state file, under the start-up limit. Start every session with a short rules card plus its own state, under the start-up hook’s limit, and resume it after a compaction. Set it up:
    1. Find your start-up hook’s output limit (ours: 10,000 characters; above it only the first 2,000 arrive).
    2. Print a short rules card plus the session’s own state file, under a cap the script enforces, and point to the full rules.
    3. Keep one state file per line of work, updated at every milestone.
    4. Log each compaction and whether its summary names the state file; message the session to resume.
    The miss that taught it: A start-up note over the limit. The hook that runs at each compaction printed the practices, then the session’s own state. It grew past the 10,000-character limit, and only the first 2,000 characters arrived, so the state went first. Noticed by the crew. What it cost: The director’s own state, lost on 2 of its 9 compactions under the old hook (13 to 15 Oct; both on 15 Oct). What it became: The hook prints a short rules card and the session’s own state file, under 9,000 characters. Since the new hook, up to the 0.4.6 release, 43 of the 44 compaction summaries across all sessions named their state file.
  6. Wake reviewers on every new version. Whoever pushes a new version messages each reviewer directly, and checks that the message started work. Set it up:
    1. Whoever opens or updates a pull request messages each reviewer.
    2. Scripts send by session id and check the reply: did a turn start, or is the message queued?
    3. Keep the timer as a backup.
    The miss that taught it: A reviewer that slept. The reviewer session reads every pull request, and its verdict is part of the merge gate. Its timer fires only while the session is awake, so it missed one. Noticed by the director. What it cost: A review waited until a message woke the reviewer. What it became: A written rule: every session that opens a pull request or pushes a new head messages the reviewer directly.

Three of the six became code. The other three are written rules, which hold only while every session reads them; in edition 1, 22 of 41 rules had code behind them.

01 · Situation finder

What do I do when…

Describe the moment in your own words. The closest runbook comes back with its steps, its commands (real showtime commands where they exist; private tools named by what they do), the model to use, the owner gates it passes, and where on this page the reasons live. Everything is on this page; nothing is sent anywhere.

02 · Releases

Nineteen days, 0.1.0 to 0.4.6

Diamonds sit on true dates. 0.3.0 made quality the default because Favio’s blind vote said so: lean 0.3.0 beat 0.2.0 on 4 of 6 and plain Opus on 7 of 8. An AI judge preferred 0.2.0’s polish, and the human’s vote decided. Dates are in UTC: the CHANGELOG dates 0.4.5 on 14 Oct, local time, and here it sits on 15 Oct.

03 · A day in the harness

Scroll the clock through one day

Each lane is a hand on the work: the owner’s gates, the main session, the sub-agents by model, Devin cloud, the creative session. Pick a day (9 Oct, the release day from 10 Oct to 11 Oct, or 15 Oct from edition 2), scroll, and the clock walks its log in order; every event lights up as it happens. Times are the log’s own. A “~” means the log gave the time as approximate; a hollow dot means the log kept the order but no time, so the clock shows the window instead of guessing. In this public edition, events that touch private work are generalized and a few are left out. The 15 Oct day is built differently: only merges, compactions, checks, reviews and releases are kept, every lane has a generic name, and its times are UTC.

from the day log
--:--

Every event of this day, as a list
TimeLaneWhatGate
03b · What a compaction keeps

The end went first

The crew caught this one. A hook runs when a session starts, resumes or compacts, and prints what the session must know. Ours printed the practices, then the session’s newest resume block. As the practices grew, the output passed the hook limit, and only a preview of its beginning reached the session, so the session’s own state, printed last, was the first thing lost. Press the buttons to see each hook arrive.

Old hook: 12,957 characters written; over the limit only a preview of the first 2,000 arrived, so the state block, printed last, was lost first. New hook: a short rules card and the session’s own state file, under the line, arrive whole. After a compaction the session sits idle until a message wakes it.

The hook limit is 10,000 characters; above it the output is saved to a file and the session gets a preview of up to the first 2,000. At one compaction on 15 Oct the old hook would have printed 12,957. From the director’s transcript: of its 9 compactions under the old hook (13 to 15 Oct), 7 arrived whole and 2, both on 15 Oct, arrived as the 2,000-character preview. The new hook stays under 9,000 and its first line says to read the full practices. Segment widths in the old bar are approximate.

The compaction log · the first five after the change, 15 Oct (UTC)
  1. 11:5618,606named its state file
  2. 11:5616,900named its state file
  3. 11:5618,172named its state file
  4. 12:0015,721named its state file
  5. 12:0518,082named its state file

Summary size in characters, on a scale from 0 to 20,000. Each compaction writes two rows into the same SQL layer as the rest of the logs. All five were started by hand, and every summary named the session’s state file.

03c · One session became many

A director and seven lanes

Until this week one long session, the director, did almost everything. From 8 Oct until the work split into lanes on 15 Oct it was compacted 19 times, and before at least 12 of those it wrote a resume block into its state file. Now each line of work runs in its own session, started from a card Favio clicks, with its own state file. Sessions talk by message; the director keeps the one list of what is open, merges, and talks to Favio. Select a lane to see the shape of its state file.

seven lanes today; two not named
04 · Model routing

Patch the task to its model

Every sub-agent gets a model picked for its task. All five patches are shown; choose a task to trace its cable. Examples marked on record are what the log attributes to that tier; kind of job marks the work the tier owns, where the log names no single run.

Edition 2 Every agent now gets an effort level as well as a model: low for agents that only collect, medium for decided, mechanical work, high for design, debugging and reviews. Reviews at decision points still go in a log with whether they changed a decision: from 12 Oct to the 0.4.6 release it has 103 rows, 61 marked yes, 41 ungraded and 1 marked no. The crew grades those rows itself, so 61 is an upper bound.

05 · Where work runs

One 20-second render, three machines

Phase 0, 8 Oct: one 20-second showreel rendered on each venue. The bars rest at their measured times; replay the race to watch them at 1 s of screen per 30 s of render.

Render race · seconds375 s
Devin, kept on one machine
  • 13 jobson one Devin machine on 9 Oct, each sent from the Mac with a small send script.
  • 83/83The full suite: 81/82 files, then 83/83, in 16 min on 8 cores.
  • 55 minsetup --full on a fresh machine, mostly music and SFX downloads.
  • 155Mac load on 9 Oct: a final render, a film build and test reviews at once.
The 13 jobs, as the log lists them (the data-toy work counts as two)

Edition 2 The build machine runs tests only, started and stopped for each run. Renders stay on the Mac, one at a time.

06 · Shipping code

Issue to release, eight gates

Every change walks the same line. Select a gate, or walk it, to see who holds it and what evidence 9 Oct left there. GitHub Actions are off on the private repos (they cost $3.88 in minutes); tests run on the Mac and on Devin.

Evidence: merged on 9 Oct
ClosesWhatThe yes

Through ~12:35 on 9 Oct, in the day log. Issues #38–#48 filed.

07 · Quality instruments

Small charts, honest scales

Each instrument answers one question. Scales start at zero; counts are drawn as counts. The last row measures the harness itself.

Plugin eval · with vs without showtime

Does the “full crew” trigger fire?

with1.00
without0.60

A scaffolded footage case, 3 runs each

with
without

Each case runs with and without showtime installed, under a cost cap.

Blind vote vs AI judge

Lean 0.3.0, in Favio’s blind vote

beat 0.2.04 of 6
beat plain Opus7 of 8

The AI judge preferred 0.2.0’s polish. Only what wins Favio’s blind vote is published. In the comparison rounds run on Devin (from 2 Oct) plain Opus won rounds 1 and 5, so that showtime reel stayed unpublished; after a density fix, round 6 (5 Oct) went showtime 1st and 2nd.

Hill-climb on skill routing · 9 Oct

Baseline pass rate, train/test split

85%train
88%baseline
93%test
0
50%
100%

Noise 1–2 runs · one root-cause patch per round (Anthropic’s eval-design method)

  • keptOne patch, a spoiler check. Once the graders were fixed it no longer helped, so it was closed.
  • foundThe gap: plans demonstrate the mechanism before asking the viewer why.
Grader audit · 9 Oct

Three graders suspected broken. Were they?

broken
broken
right; the skill was wrong

The fixed graders merged on 9 Oct (closes #35).

Fable’s catches · #24 render stall
FIX FIRST FIX FIRST MERGED
  1. A CHANGELOG entry in the wrong release
  2. An unbacked “0.4 of a core” claim
  3. A wrong 5% that should be ~10%
  4. A false-fire risk on a rejected CDP call

All four fixed, then merged.

Jev · evaluation, 8 Oct

Dedup suggestions: 57 of 65 decided, all right

Favio’s spot check10/10
whole evaluation$0.02

Jev’s answers are suggestions only.

Measured · the 0.4.2 wave, as of 11 Oct
Reviews · 27 PRs with both reviews
  • about 78%of Devin’s 223 first-pass findings led to a change: 7 blockers and 55 of 57 should-fix (counted from the review files, 11 Oct).
  • 20%of the Mac review’s 25 items did. Its value is in the tests it runs against main and against mutants. Its 2 false alarms were environment notes it flagged itself.
  • 6 of 6should-fix items from Fable’s release-candidate review were fixed; no per-PR review had seen them.
  • 10 of 11problems found after both reviews said MERGE showed up on CI runners, outside the Mac review.
The owner’s gate · at least 283 asks in 16 days
  • 64%yes as asked; 68 came back changed, 9 declined, 26 were left as the work moved on.
  • 3.6 minmedian time to his answer (p90 27 min), sleep and time away included.
  • 22 → 1merge asks, before and after his standing yes for 0.4.2 merges. Answered merge asks were yes every time, in a median 1.9 min.
  • 38 of 92design asks came back changed, which is where his taste goes into the work.
Rules in code · audit of 11 Oct
11before
22now
41rules

Rules enforced by code: a test, a hook or a script that refuses. 7 more are partly enforced; 12 are still prose.

  • heavyOne heavy job at a time on the Mac, with a quiet window.
  • mergeA code PR cannot merge without the Mac review’s changed-tests run.
  • publicPublish-bound files pass the same safety check as public issues.
SQL over the harness

CI runs and test times, the owner’s asks, review findings and the model log sit behind DuckDB views. Agents ask them in SQL through DuckDB’s agent mode, which answers in compact tables: 472 bytes instead of 1,206 for the same question.

One view answers the release question: has main passed the full nightly on all four systems, twice in a row?

Edition 2 · the verdict was for an earlier cut

The film with the label at 0:46 had passed a critic. The critic’s last round judged an earlier render, final-7, which had no overlap, and said post it. The crew then fixed what that round had found, and the fixes moved a label. No round judged final-10, the render that went out. The director checked its contact sheet and passed it too.

Pick a render and scrub its synthetic film. Under the scrubber, the page runs the same test showtime’s check runs: each text box goes through its transform, and two boxes that overlap by more than a few pixels both ways are a hit. It is the same test, not the same code, and it runs only at the time you scrub to. Sweep runs it every 0.1 s; the check steps every 0.1 to 0.25 s, by the film’s length.

Renders final-7 to final-10 of one film. The critic’s last round judged final-7 and said post it; it had no overlap. Fixes for that round’s findings went into later renders, and final-10 went out without a critic round. The text-over-text check, run on final-10, reports an overlap from 0:45.5 to 0:47.2. The check is in showtime from 0.4.6.

final-7 judged, no overlapfinal-10 never judged, overlap 0:45.5 to 0:47.2in showtime check from 0.4.6

The film here is drawn for this page; it only stands in for the real one. On the real film the check reports 0:45.50 to 0:47.23, and across 43 projects and 10 templates laid out in portrait it raised no false alarm.

Edition 2 · four days, measured
Time to merge · every PR, 9 to 16 Oct

From the first article (12 Oct, 17:43 UTC) to the 0.4.6 release (16 Oct, 15:15 UTC), 49 PRs merged, with a median of 1.6 hours open (p90 7.8 h) and a median of 158 added lines. In the repo’s first four days, 50 PRs merged with a median of 3.0 hours and 91 added lines.

Bigger PRs stay open longer. Split by size, PRs still merged faster than in the repo’s first four days: 3.3 h against 5.2 h at 200 or more added lines (19 PRs against 15), 0.8 h against 2.5 h under 200 (30 against 35). The groups are small, so read it as a direction. The PRs are in the private working repo, so they are shown by merge time only. Hours are on a log scale with a floor at one minute, and dot area grows with added lines, capped at 4,000.

Every PR, as a table
Merged (UTC)Hours openAdded lines
Favio’s gate · at least 181 asks, 12 to 16 Oct
  • 35 of 42multiple-choice asks from 12 to 15 Oct that carried a recommended option were answered with it. The crew briefs well, or Favio, when busy, clicks the first button; this data can’t tell which.
  • 11 of 53design asks came back changed (21%), against 38 of 92 in edition 1 (41%).
  • 1.9 minmedian answer, against 3.6 min in edition 1.

Counted from our log of asks, which is built from the chat, so read every number as a floor; the multiple-choice line comes from one pass over the chat, 12 to 15 Oct.

The cloud reviewer · first pass, edition 1 and 2

Share of findings fixed on the same PR

blockers11 of 11
should-fix54 of 61
nits71 of 193
overall51%

Edition 1: blockers 7 of 7, should-fix 55 of 57, nits 111 of 157, no false alarm. Edition 2, to the 0.4.6 release: three false alarms. Overall pools the three rows: 173 of 221 in edition 1, 136 of 265 now, where the 6 nits whose outcome is unknown count as not fixed. Same rule both times: a finding counts only if it was fixed on the same PR. Read from the review prose, to within a few points.

The reviewer session · reads every PR
  • 242first-pass findings on 46 PRs, to the 0.4.6 release.
  • 60%of them led to a change; for 40 the outcome is unknown.
  • 13verdict rounds on one PR by 15 Oct, the most for any.

Its verdict is part of the merge gate. Since 15 Oct every lane messages it on each new head.

08 · Case study

The render stall, decided by data

Issue #24, merged on 9 Oct. The stuck-frame guard works, but a Chrome flag that helps on one OS blinds the guard on the other, and the numbers decide where the flag stays. Every step’s text is in the list; the monitor shows its instrument.

09 · Films reel

Each film, its own voice, look and music

Each film differs in voice, look and music, and each shows off a different feature. Swatches are drawn here to suggest each look; they are not frames from the films. Fields the log does not record are marked as such.

10 · Guardrails

Interlocks

Three interlocks every agent works under: keys stay out of sight, spending and publishing wait for a fresh yes, and the working repo stays private. Some are enforced by hooks and scripts that refuse; the rest are written rules (see “Rules in code” in section 07).

Keys

  • Only in ~/.config, mode 600, and never printed.
  • For headless jobs the API key is set per command, never exported: exporting it would move interactive sessions to API billing.
  • Git hooks and the issue tool block key contents.
  • The cloud Project holds no keys and never gets device access.

Approvals

  • Merges, spending, public issues and anything public need Favio’s yes in chat, each time.
  • Relayed approvals don’t count.
  • A one-night rule to merge what passed the Mac review held for that night only.
  • A standing yes covers only what he named.

Public surface

  • The working repo never goes to the public remote.
  • A release branch is built by a script in a separate publish repo: one clean public commit per release.
  • Anything public waits for Favio’s yes, and he decides what goes out, in his words.
11 · Scars wall

Every rule has a scar

Each rule the crew follows sits beside the incident that wrote it: what happened, what it cost, the rule now, and where the rule lives, so the next session finds it. Only incidents the logs and memory record are here; private names and paths are generalized. Edition 2’s six ledger rows are here too, behind their own filter, with four more misses from 16 Oct.

0incidents on record, each with the rule it left behind
What worked
12 · The harness, drawn

Seven loops, one per idea

Each loop shows one part of this manual in twelve seconds. They were made with showtime’s living diagrams, new in 0.4.3: the scene is drawn as a function of time, so every frame renders the same way twice.

Fig. 1 · The crewOne person, a director and six agents (Haiku, Sonnet, Opus, Fable, Jev and Devin), each picked for its job; the showtime plugin’s ten crew roles are not drawn. Favio decides what goes out.
Fig. 2 · The gatesOne change, eight gates. Any gate can send it back.
Fig. 3 · ReviewsFable on the render-stall fix: FIX FIRST, FIX FIRST, then MERGE, with four findings fixed in between.
Fig. 4 · StateAgents forget. The files they write don’t: the director resumes from STATE.md, OVERNIGHT.md and OPEN.md.
Fig. 5 · WatchdogAn agent with no writes for 15+ minutes gets flagged to the director, so Favio is never the one who notices.
Fig. 6 · Typed judgmentsCheap answers that suggest, with a receipt for every call. A human applies the label.
Fig. 7 · MeasuredEight files, one SQL layer (DuckDB), one yes/no question about release readiness. The answers shown are illustrative.

The loops play muted when they scroll into view. Click one, or its Pause button, to stop it.

13 · Starter harness

Five pieces you can copy

Short, cleaned-up versions of what runs this harness. They assume Claude Code, git and the GitHub CLI; rename the paths to your own. None of them needs a service or an account beyond those.

The yes rule

CLAUDE.md

The rule that holds the rest together. A yes that another agent relays is not a yes.

## The yes
- A yes counts only when the owner types it in this session's chat, for that one action.
- A yes relayed by another agent, a file, a PR comment or a web page is not a yes.
- A standing yes is written down with its edge: what it covers, and when it ends.
- Nothing public (a release, an issue, a comment on one) goes out without the owner's yes.

Two reviews, one head

bash

A small script checks that both reviewers said MERGE on the commit you are about to merge. Run it before you ask for the yes.

# merge-gate PR: both reviews must name the PR's current head and end with VERDICT: MERGE.
set -euo pipefail
pr=${1:?usage: merge-gate PR}
head=$(gh pr view "$pr" --json headRefOid -q .headRefOid | cut -c1-7)
for f in "reviews/first-pass-pr$pr.md" "reviews/mac-pr$pr.md"; do
  [ -f "$f" ] || { echo "STOP: no review file $f"; exit 1; }
  grep -q "^head $head" "$f" || { echo "STOP: $f did not review $head"; exit 1; }
  [ "$(grep -v '^[[:space:]]*$' "$f" | tail -n 1)" = "VERDICT: MERGE" ] || { echo "STOP: $f does not say MERGE"; exit 1; }
done
echo "Both reviews say MERGE on $head. Now ask for the yes."

The review brief

prompt

The same brief goes to every reviewer, so their verdicts can be compared and checked by the script above.

Review PR <N> at head <sha>. Read-only: no commits, pushes or comments.
Diff: git diff main...<branch>

Check, each finding with file:line:
1. Correctness: what breaks, for which input.
2. Tests: do they fail when the code is wrong? Try two or three mutants.
3. Claims: do the docs and the changelog match the code?
4. Privacy and security: paths, keys, anything that leaves the machine.

Run only the focused tests, in a throwaway worktree, and remove it after.
Write reviews/<first-pass|mac>-pr<N>.md with Blocker / Should-fix / Nit,
a line "head <sha>", and a last line "VERDICT: MERGE" or "VERDICT: FIX FIRST".

The resume block

STATE.md

Written at the top of STATE.md before every compaction, so the next context starts where this one stopped.

# RESUME HERE (written <date> <time>, before a compaction)
Read this, then OPEN.md.

## Waiting on the owner
- <item>: <where it is>, <the decision needed>

## Running
- <lane>: <agent or session>, <branch or file it writes>, <how you'll know it's done>

## Rules added today
- <rule> (<who said it>, <when>)

The watchdog

bash

Flags a Claude Code agent whose transcript ends on an unanswered tool call and has been silent for 15 minutes. Run it every few minutes and send its output wherever you look first.

# watchdog: transcripts touched in the last 6 h, silent 15+ min, ending on a pending tool call.
now=$(date +%s)
for f in ~/.claude/projects/*/*.jsonl ~/.claude/projects/*/*/subagents/*.jsonl; do
  [ -f "$f" ] || continue
  m=$(stat -L -c %Y "$f" 2>/dev/null || stat -L -f %m "$f")   # GNU first, then BSD; -L: a symlink's own age lies
  age=$(( now - m ))
  { [ "$age" -ge 900 ] && [ "$age" -le 21600 ]; } || continue
  tail -n 1 "$f" | jq -e '
    (.type == "assistant" and any(.message.content[]?; .type == "tool_use")) or
    (.type == "user" and any(.message.content[]?; .type == "tool_result"))' >/dev/null 2>&1 \
    && echo "stalled ${age}s: $f"
done
14 · Next

New in 0.4.3: living diagrams

Edition 2 · in 0.4.6
  • in 0.4.6

    Text over text: showtime check steps through the whole timeline, every 0.1 to 0.25 s by the film’s length, and reports any two pieces of text that overlap, on the page or on any canvas.

  • in 0.4.6

    The sound strip fix and its test: the strip placed its ticks by film time and ignored where the clip starts.

  • in 0.4.6

    Text drawn outside the area a phone app leaves free: check now compares every text a page draws on its own canvas with that area, at every step. Before, 33, 29 and 13 pieces of text in three portrait films passed.

  • in 0.4.6

    A page that stops answering: check now ends with an error that names the late step, instead of waiting a minute for each step.

  • not a check yet

    Lines drawn under text: 10 pieces of text in one film.

Both gaps were found the same day by the session that built the overlap check; the first is a check in 0.4.6, the second is not one yet. If the pattern holds, the next miss will be on something the crew has not made before.

The showtime harness · public edition. Compiled from the crew’s logs and notes, as of 16 Oct 2026. Editions: 1 · 11 Oct 2026 · Many hands, one yes. 2 · 16 Oct 2026 · Six practices. showtime is open source: github.com/FavioVazquez/showtime